PM Modi Launches Namma Metro Pink Line in Bengaluru

Spread the love

Prime Minister Narendra Modi on Friday inaugurated the much-awaited Pink Line of Bengaluru’s Namma Metro, marking a major milestone in the city’s public transportation network. The Prime Minister also took an inaugural metro ride alongside Karnataka Chief Minister D.K. Shivakumar.

The newly inaugurated 7.5-kilometre elevated stretch connects Kalena Agrahara to Tavarekere in South Bengaluru. Developed at an estimated cost of ₹3,470 crore, the new corridor is expected to improve connectivity, reduce commuting difficulties and provide a faster travel option for thousands of daily passengers.

The inauguration is an important step towards completing the entire Pink Line, which will eventually connect South Bengaluru with Nagawara in the northern part of the city.

Bengaluru Metro Pink Line: Route and Stations

The newly inaugurated elevated section covers approximately 7.5 kilometres and includes six metro stations:

  1. Kalena Agrahara
  2. Hulimavu
  3. Bilekahalli-IIMB
  4. JP Nagar 4th Phase
  5. Jayadeva Hospital
  6. Tavarekere

One of the major highlights of this corridor is the interchange facility at Jayadeva Hospital, which connects the Pink Line with the Yellow Line. This will make it easier for commuters travelling towards important destinations, including Electronic City.

When Will Bengaluru Metro Pink Line Services Start?

Although Prime Minister Narendra Modi inaugurated the elevated section on November 13, passenger services are scheduled to begin on Saturday, November 14, 2026, from 6:00 AM.

According to information shared by officials, trains are initially expected to operate at intervals of approximately eight minutes. Five train sets have been allocated for the service, with four designated for regular operations and one kept on standby.

The train frequency may be reviewed depending on passenger demand and operational performance.

Full Pink Line Project to Cover 21.25 Kilometres

The complete Bengaluru Metro Pink Line is planned to cover approximately 21.25 kilometres, featuring 18 stations. It consists of an elevated section of around 7.5 kilometres and an underground stretch of approximately 13.75 kilometres.

While the elevated section has now been inaugurated, work on the remaining underground portion, extending from Tavarekere towards Nagawara, is still underway.

Once completed, the entire corridor is expected to provide a significant north-south connectivity link across Bengaluru, connecting several residential, commercial and important urban areas.

Bengaluru Metro Network Crosses 100-Km Milestone

The opening of the Pink Line’s elevated section takes Bengaluru’s operational metro network beyond the 100-kilometre mark, reaching approximately 103.6 kilometres.

This development strengthens Namma Metro’s position among India’s largest urban metro networks and represents a major advancement in Bengaluru’s public transportation infrastructure.

A Major Boost for Bengaluru’s Daily Commuters

Bengaluru has long faced challenges related to road congestion and increasing travel times. The launch of the Pink Line is expected to offer commuters another reliable public transport option, particularly for people travelling along the busy Bannerghatta Road corridor.

With its connection to the Yellow Line and the upcoming underground extension, the Pink Line is expected to play an important role in improving urban mobility and reducing dependence on private vehicles.

The inauguration marks a significant step in Bengaluru’s infrastructure development. Once the remaining underground section becomes operational, the Pink Line is expected to further transform daily commuting across the city.